Material Comparison for Pumped-Storage Hydropower Stations: Smooth‑Surface Geomembrane vs. Nitrogen‑Enhanced Rough‑Surface Geomembrane—The Difference in Friction Performance Is Immediately Apparent

Release date:

2026-05-30


Pumped-storage hydropower stations serve as the core energy storage component of China’s new-type power system, Structural Stability of the Impermeable Barrier System It directly affects engineering safety and long-term, reliable operation. Geomembranes are the core, critical materials of the seepage-control system, and… Direct shear friction coefficient at the interface between geomembrane and geotextile , It is also a core technical indicator for evaluating the anti‑sliding performance of the impermeable layer and the overall structural stability.

To scientifically select seepage-control materials that meet the stringent operating conditions of pumped-storage hydropower, Haoyang Environment, drawing on nationally recognized authoritative testing data, has conducted… For pumped-storage power stations only Sprayed rough geotextile membrane and Nitrogen-inflated textured geomembrane A specialized comparative performance study on direct shear friction coefficients was conducted, with field measurements confirming the superior mechanical properties of the dedicated rough-surfaced geomembrane, thereby providing a professional reference for seepage‑control material selection in pumped‑storage projects.

Authoritative benchmark testing ensures greater data comparability.

 

The entire comparative testing process was conducted by National Chemical Building Materials Testing Center Professional execution, The testing standard uniformly adopts the international standard ASTM D5321/D5321M-21. The tests are consistently conducted using polyester filament. Nonwoven geotextile Interface direct shear friction tests were conducted, with normal stress levels set at 100 kPa, 150 kPa, and 200 kPa. The test environment, operational procedures, and testing equipment were kept identical throughout, with rigorous control of all variables. The resulting data are authoritative, reliable, and highly informative.

Core data from actual measurements reveal a significant gap in friction performance.

Spray‑on textured geomembrane for pumped-storage power stations

Lateral direct shear friction coefficient: 0.485

Vertical direct shear friction coefficient: 0.455

Composite mean of longitudinal and lateral directions: approximately 0.470

Nitrogen-inflated textured geomembrane

Lateral direct shear friction coefficient: 0.397

Vertical direct shear friction coefficient: 0.369

Composite mean of longitudinal and lateral directions: approximately 0.383

Specialized rough-surfaced geomembrane for pumped-storage hydropower stations, compared with nitrogen‑inflated rough-surfaced geomembrane. Lateral friction coefficient increased by 22.2% , Longitudinal friction coefficient improved by 23.3% , The overall interfacial friction performance has improved significantly.

High coefficient of friction, suitable for the complex and demanding operating conditions of pumped-storage power stations.

Pumped-storage hydropower stations are subjected year-round to extreme operating conditions, including high head, frequent water-level fluctuations, and substantial shear stresses in the soil. If the interfacial friction between the geomembrane and geotextile is insufficient, slippage and misalignment of the impermeable liner can readily occur, leading to structural load imbalance and posing a significant safety hazard.

The specialized sprayed‑rough geotextile membrane used at the Haoyang Pumped‑Storage Power Station, with its higher interfacial friction coefficient, highlights two key advantages:

1. Anti-sliding stability The enhanced interface bonding significantly improves compactness, effectively resisting shear forces induced by reservoir water pressure and soil displacement, thereby eliminating at the source safety risks such as seepage‑control layer slippage and structural instability.

2. Superior long-term durability: The specially formulated rough-surfaced concrete, produced using a dedicated spraying process, exhibits a uniform and dense texture, with minimal degradation of friction performance over extended service life. It remains unaffected by fluctuations in water level, temperature, or soil conditions, significantly reducing subsequent operation, maintenance, and repair costs and ensuring the power station’s sustained safe operation.

Cutting-edge craftsmanship empowers the industry, with one-step rough-spray technology leading the way.

Nitrogen‑enhanced compaction is a conventional, standard compaction technique that can only meet the basic requirements of typical seepage‑control projects and falls short of the stringent standards required for pumped‑storage hydropower facilities.

HaoYang Environment, leveraging its proprietary, world‑first one‑step double‑sided roughening technology, has developed a specialized roughened geomembrane tailored for pumped‑storage applications.

1. The substrate is produced using an ultra-wide, five-layer co-extrusion blow-molding line, and a textured layer is applied simultaneously to both sides in-line while the substrate is still partially cooled, achieving molecular-level bonding between the textured layer and the film substrate.

2. This solution comprehensively addresses longstanding industry challenges, including the low friction coefficient of conventional textured geomembranes, the tendency of the textured surface to delaminate, poor stability during slope installation, and low production efficiency. It significantly enhances interfacial bonding strength and peel resistance, thereby substantially improving the overall stability of slope and reservoir‑basin impermeability systems.


Latest Updates

Xiaodonggou Molybdenum Mine Tailings Pond Project of Chifeng Chuyuan Mining Co., Ltd.

It is a key environmental protection project in the mining sector of Chifeng City, Inner Mongolia Autonomous Region, with a total investment of approximately RMB 350 million. Located in Songshan District, Chifeng City, the project is dedicated to the treatment of tailings generated during molybdenum ore beneficiation. By implementing high‑standard seepage control and intelligent management, it effectively prevents heavy‑metal contamination, safeguarding the water environment of the upper reaches of the Xiliao River and the surrounding ecological safety.

Chiyinman Phase II Tailings Pond Project

A “double-layer composite impermeable structure” is adopted: the primary impermeable layer consists of a 2.0 mm‑thick HDPE geomembrane (UV‑resistant and chemically corrosion‑resistant), while the secondary impermeable layer comprises a 1.5 mm‑thick HDPE geomembrane combined with a GCL bentonite liner, with a permeability coefficient ≤ 1 × 10⁻¹² cm/s.

Shandong Province Industrial Solid Waste (Hazardous Waste) Disposal Center Renovation and Expansion Project

The total investment amounts to approximately RMB 850 million. Leveraging the existing treatment center, the project will expand its capacity and upgrade its technology, with the aim of establishing a hazardous waste‑management hub that covers the entire value chain—from collection and storage to treatment and resource recovery—thereby addressing regional imbalances in hazardous waste‑treatment capacity across the province and safeguarding the ecological environment of the Yellow River Basin. Haoyang Environment supplied 92,000 m² of geomembrane, 105,937 m² of geotextile, 48,000 m² of composite drainage mats, and 800 m of biaxial plastic geogrids, under a contract worth RMB 3.5 million.

Supplementary Agreement to the Subcontract for the Impermeable Liner System of the General Solid Waste Landfill Project at Shanggan Mountain Forest Farm, Shanggao County

Under this agreement, an additional investment of RMB 28 million has been made on the basis of the original contract. In response to the forest farm’s ecologically sensitive characteristics, the seepage‑control standards have been upgraded, transforming the project into a demonstration facility for integrated environmental protection that combines “forestland” with “solid waste treatment” in the middle reaches of the Yangtze River. Haoyang Environment supplied 32,000 m² of double‑textured geomembrane, 32,000 m² of composite drainage geonet, and 32,000 m² of filament‑woven geotextile, with a contract value of RMB 1.2704 million.

Construction of the Ecological Comprehensive Remediation and Restoration Project for the Tieshanzhang Abandoned Mine Area in Guangdong Province (Xingning Section) – Seepage Control Works

It is a key ecological restoration project in Meizhou City, Guangdong Province, implemented by the Xingning Municipal Bureau of Natural Resources. With a total investment of approximately RMB 180 million, the project focuses on addressing historical heavy-metal contamination and soil‑water loss in former mining areas. Located in the Tieshanzhang mining district of Huanghuai Town, Xingning City, the project covers an area of about 85 hectares and employs seepage‑control and barrier technologies to prevent the migration of pollutants, thereby restoring the local ecological environment.

Hazardous Waste Landfill of the Chenyu Environmental Protection Hazardous Waste Harmless Treatment Project in Zhongwei City

The total investment amounts to approximately RMB 350 million. Located in the Industrial Park of Zhongwei City, the project is dedicated to the safe landfill disposal of hazardous waste, with a designed annual treatment capacity of 50,000 tons and a service life of 20 years. It aims to address the challenges of end-of‑life hazardous waste management in Ningxia and neighboring regions, thereby safeguarding environmental security in the Yellow River Basin. Haoyang Environment supplied 42,000 m² of 2.0 mm textured and smooth geomembranes, 42,000 m² of 1.5 mm smooth and textured geomembranes, 42,000 m² of geotextiles, 42,000 m² of drainage nets, 12,000 m² of waterproof blankets, 100,000 m² of filament‑woven fabrics, and 110,000 anti‑aging woven bags, with a contract value of RMB 6.54536 million.