HAOYANG CULTURE

Before welding, first “tear off” a layer of film—Haoyang Environmental Geomembrane’s innovation ensures that every weld seam looks as good as new.

Release date:

2026-05-30


 

 

In geomembrane welding in the Gobi Desert, the biggest concern isn’t the wind—it’s “contamination.”

Weld quality depends 70% on a clean weld surface and 30% on welding technique.

But in the Gobi Desert, Mine tailings In places like landfills, the word “clean” is almost an unattainable luxury:

Strong winds and heavy dust—no sooner had the membrane been laid than, before welding even began, a layer of sand had already settled on its surface.

Large diurnal temperature swings—condensation forms on the membrane surface, leading to moisture re‑entry; the moisture seeps in silently, invisible to the naked eye, and the weld seams fail to seal it.


 

What about the traditional method? Just wipe it and blow on it.

The result is: cold solder joints, slag inclusions, porosity, and pressure leakage—reliance on luck alone for leak‑proofing quality.

We have added an additional layer at the lap joints of the geomembrane welds. Easy-tear film The principle is simple, but it addresses a real problem:


 

Stage

Traditional geomembrane

Haoyang Geomembrane

After paving

The membrane surface is directly exposed, with windblown sand and dust settling at any time.

Covered with an easy-tear film, the weld seam area is always sealed and protected.

Before welding

Hasty cleaning—results depend entirely on your feel.

Peel off the easy-tear film; the weld area is fresh, clean, and free of dust and water.

During welding

Hard soldering with residual contamination carries a high risk of cold solder joints.

The membrane surface is as good as new, with weld adhesion at its peak.

After welding

The lap joint edges are exposed, posing a high risk of secondary contamination.

Lap-seal edge + easy-tear film structure, double sealing


 

With a single tear and lift, the weld‑overlap area transforms from a “dusty, aged membrane surface” to a “new‑from‑the‑factory membrane surface.”


Latest Updates

Xiaodonggou Molybdenum Mine Tailings Pond Project of Chifeng Chuyuan Mining Co., Ltd.

It is a key environmental protection project in the mining sector of Chifeng City, Inner Mongolia Autonomous Region, with a total investment of approximately RMB 350 million. Located in Songshan District, Chifeng City, the project is dedicated to the treatment of tailings generated during molybdenum ore beneficiation. By implementing high‑standard seepage control and intelligent management, it effectively prevents heavy‑metal contamination, safeguarding the water environment of the upper reaches of the Xiliao River and the surrounding ecological safety.

Chiyinman Phase II Tailings Pond Project

A “double-layer composite impermeable structure” is adopted: the primary impermeable layer consists of a 2.0 mm‑thick HDPE geomembrane (UV‑resistant and chemically corrosion‑resistant), while the secondary impermeable layer comprises a 1.5 mm‑thick HDPE geomembrane combined with a GCL bentonite liner, with a permeability coefficient ≤ 1 × 10⁻¹² cm/s.

Shandong Province Industrial Solid Waste (Hazardous Waste) Disposal Center Renovation and Expansion Project

The total investment amounts to approximately RMB 850 million. Leveraging the existing treatment center, the project will expand its capacity and upgrade its technology, with the aim of establishing a hazardous waste‑management hub that covers the entire value chain—from collection and storage to treatment and resource recovery—thereby addressing regional imbalances in hazardous waste‑treatment capacity across the province and safeguarding the ecological environment of the Yellow River Basin. Haoyang Environment supplied 92,000 m² of geomembrane, 105,937 m² of geotextile, 48,000 m² of composite drainage mats, and 800 m of biaxial plastic geogrids, under a contract worth RMB 3.5 million.

Supplementary Agreement to the Subcontract for the Impermeable Liner System of the General Solid Waste Landfill Project at Shanggan Mountain Forest Farm, Shanggao County

Under this agreement, an additional investment of RMB 28 million has been made on the basis of the original contract. In response to the forest farm’s ecologically sensitive characteristics, the seepage‑control standards have been upgraded, transforming the project into a demonstration facility for integrated environmental protection that combines “forestland” with “solid waste treatment” in the middle reaches of the Yangtze River. Haoyang Environment supplied 32,000 m² of double‑textured geomembrane, 32,000 m² of composite drainage geonet, and 32,000 m² of filament‑woven geotextile, with a contract value of RMB 1.2704 million.

Construction of the Ecological Comprehensive Remediation and Restoration Project for the Tieshanzhang Abandoned Mine Area in Guangdong Province (Xingning Section) – Seepage Control Works

It is a key ecological restoration project in Meizhou City, Guangdong Province, implemented by the Xingning Municipal Bureau of Natural Resources. With a total investment of approximately RMB 180 million, the project focuses on addressing historical heavy-metal contamination and soil‑water loss in former mining areas. Located in the Tieshanzhang mining district of Huanghuai Town, Xingning City, the project covers an area of about 85 hectares and employs seepage‑control and barrier technologies to prevent the migration of pollutants, thereby restoring the local ecological environment.

Hazardous Waste Landfill of the Chenyu Environmental Protection Hazardous Waste Harmless Treatment Project in Zhongwei City

The total investment amounts to approximately RMB 350 million. Located in the Industrial Park of Zhongwei City, the project is dedicated to the safe landfill disposal of hazardous waste, with a designed annual treatment capacity of 50,000 tons and a service life of 20 years. It aims to address the challenges of end-of‑life hazardous waste management in Ningxia and neighboring regions, thereby safeguarding environmental security in the Yellow River Basin. Haoyang Environment supplied 42,000 m² of 2.0 mm textured and smooth geomembranes, 42,000 m² of 1.5 mm smooth and textured geomembranes, 42,000 m² of geotextiles, 42,000 m² of drainage nets, 12,000 m² of waterproof blankets, 100,000 m² of filament‑woven fabrics, and 110,000 anti‑aging woven bags, with a contract value of RMB 6.54536 million.